The Kenya Ports Authority (KPA) has announced a set of measures aimed at keeping Ugandan importers and exporters using the Port of Mombasa, as uncertainty hangs over plans to extend the Standard Gauge Railway (SGR) from Malaba to Kampala.

According to Kenyans.co.ke, the authority unveiled the plan on Saturday, November 28, during celebrations marking 30 years of KPA's presence in Uganda.

What the plan involves

KPA said it intends to make it easier for Ugandan businesses to move goods through Mombasa. The measures include expanding cargo handling capacity, simplifying and speeding up cargo documentation, and rolling out more digital systems to track consignments.

The authority also pledged to address operational difficulties that Ugandan traders have faced and to upgrade services at the Inland Container Depots (ICDs) in Nairobi and Naivasha.

In a statement, KPA said it had outlined steps to boost capacity and "entrench digitalization for faster cargo processing beyond the Port of Mombasa".

Questions over the railway link

The announcement comes as doubts grow about Uganda's portion of the regional railway. Uganda's Chief of Defence Forces, Muhoozi Kainerugaba, reportedly announced the cancellation of a Ksh385 billion contract that had been awarded to Turkish company Yapi Merkezi to build the Kampala-Malaba line.

That line was meant to join Kenya's planned Naivasha-Kisumu-Malaba SGR extension, creating an unbroken rail corridor between the Port of Mombasa and the Ugandan capital.

The reported cancellation has raised fresh questions about when the cross-border connection will be completed. Kenya, however, is pressing ahead with its own extension from Naivasha to Malaba through Kisumu.

KPA said the national government continues to advance plans for the railway to reach Malaba, with Uganda expected to take the line onward to Kampala. Kenya has presented the Malaba extension as a key link to deepen trade between the two countries.

Three decades of growing cargo

Uganda remains one of the most important users of the Mombasa port. According to KPA, cargo handled for the landlocked country has grown from 1.2 million metric tonnes in 1996 to 10.9 million metric tonnes in 2025.

The authority said it expects volumes to rise further in 2026.

The new measures signal KPA's effort to protect that business by improving efficiency at the port and inland depots, regardless of how quickly the full rail link between Mombasa and Kampala materialises.

This story was prepared by the Hamasta Newsdesk with AI assistance, based on reporting by Kenyans.co.ke. Read the original report. Photo: Kenyans.co.ke.