State House has asked Parliament for an additional Ksh8.43 billion for the 2027/28 financial year, arguing that the proposed allocation falls short of what it needs to run President William Ruto's operations and carry out planned projects, according to Kenyans.co.ke.

If approved, the request would raise the institution's total budget requirement to Ksh23.57 billion, up from the Ksh15.14 billion ceiling set out in the 2027 Budget Policy Statement (BPS).

State House Comptroller Katoo Ole Metito made the case on Monday, November 23, 2026, when he appeared before the National Assembly's Departmental Committee on Administration and Internal Security, which is reviewing the BPS.

Ole Metito told the committee that the proposed ceiling was "inadequate to facilitate the implementation of planned activities" submitted during sector hearings.

Where the extra money would go

The bulk of the additional funding, Ksh7.78 billion, is earmarked for recurrent operations and maintenance. This covers presidential functions, events and other activities across State Houses and State Lodges.

On the development side, State House is seeking:

  • Ksh526.5 million for refurbishment and installation of surveillance systems across State Houses and State Lodges
  • Ksh124.9 million for ICT networking and communications equipment, intended to maintain ICT infrastructure and digitise Cabinet business

Ksh1.05bn for refurbishments

Separately, State House has proposed a development ceiling of Ksh1.05 billion for 2027/28 to refurbish and develop State Houses, State Lodges and related infrastructure around the country.

The Nairobi State House building refurbishment tops the list with a proposed Ksh383.5 million. The project carries an estimated total cost of Ksh3.33 billion, with cumulative spending standing at Ksh1.80 billion as of September 30, 2026.

Since 2022, the Nairobi refurbishment has delivered a major overhaul of both the exterior and interior of the main residence, Kenyans.co.ke reported.

Other proposed allocations in the schedule include:

  • Kisumu State Lodge refurbishment – Ksh150 million
  • Nakuru State House refurbishment – Ksh110 million
  • Kakamega State Lodge refurbishment (buildings) – Ksh100 million
  • Mombasa State House refurbishment, Phase 2 (fence and main house) – Ksh70 million
  • Eldoret State Lodge refurbishment – Ksh50 million
  • Sagana State Lodge refurbishment – Ksh30 million
  • Mtito Andei State Lodge building refurbishment – Ksh20 million
  • Ruiru mechanical garage – Ksh12.9 million
  • Kisii State Lodge refurbishment – Ksh12.6 million

A further Ksh80 million has been set aside for ICT networking and communications equipment in Nairobi.

What happens next

The committee's consideration of the request forms part of Parliament's review of the 2027 Budget Policy Statement, which sets spending ceilings for government institutions ahead of the formal budget estimates.

It remains to be seen whether lawmakers will back the request for additional funding, which would represent a significant increase over the ceiling currently proposed for State House.

This story was prepared by the Hamasta Newsdesk with AI assistance, based on reporting by Kenyans.co.ke. Read the original report. Photo: Kenyans.co.ke.