Motorists in Nairobi's Kawangware area will have to find other ways around a section of Gitanga Road for 10 days, after the Kenya Urban Roads Authority (KURA) announced a partial closure to allow drainage works.

According to Tuko, a public notice from the authority says the restriction will take effect at 6:00 AM on Thursday, November 26, 2026, and remain in place until 6:00 PM on December 5, 2026.

The affected stretch lies between kilometre 0+520 and kilometre 0+620. KURA says the closure is needed so that workers can safely build a cross culvert meant to increase the road's drainage capacity.

Pedestrians to keep access

While vehicles will be restricted on the section, KURA has said a walkway will stay open for pedestrians throughout the works, allowing people on foot to continue moving through the area.

The authority has also warned road users to be especially careful because the site overlaps with a busy commercial area close to the Kawangware Open-Air Market and nearby roadside traders.

Diversions for different vehicles

KURA has released a colour-coded diversion plan to steer traffic around the construction zone. The routes differ depending on the direction of travel and the type of vehicle:

  • Into Kawangware: Drivers are directed to Naivasha Road, which links to a diversion leading back towards Gitanga Road.
  • Towards Nairobi or for local access: Motorists should use Salim Road, then Macharia Road, before rejoining Gitanga Road heading towards the city centre.
  • PSVs and heavy vehicles: Public service vehicles and goods vehicles heavier than 7.5 tonnes must use the Naivasha Road route to avoid the work zone entirely.

Matatus, buses and lorries in these categories will not be allowed on the lighter diversion routes set aside for private cars, according to the notice.

Traffic marshals and flagmen will be posted at key junctions to help manage the flow of vehicles. KURA has asked motorists to obey instructions from traffic police officers deployed at the site.

Other closures in the region

The Kawangware works come amid several other road disruptions announced by the authority. Tuko reports that KURA has also temporarily closed the Mlolongo-Kamulu Quarry Road and provided alternative routes for motorists using it.

In addition, the authority has extended the closure of Eldoret Road until December 30, citing construction delays tied to a bridge project over the Nairobi River.

The closures fall in the run-up to the festive season, when traffic in and around the capital typically increases. Motorists are advised to plan their journeys in advance and allow extra time when travelling through the affected areas.

This story was prepared by the Hamasta Newsdesk with AI assistance, based on reporting by Tuko. Read the original report. Photo: Tuko.