Motorists using the Lower Kabete-Ndumbuini/Kapenguria-Uthiru Interchange along Waiyaki Way should prepare for about two months of disruption, after the Kenya National Highways Authority (KeNHA) announced the closure of several access points to make way for reconstruction works.

According to Kenyans.co.ke, the roads agency said the disruption will begin on Wednesday, December 2, 2026, and run until Sunday, January 31. The notice was issued on Wednesday, November 25.

KeNHA said the closure is necessary to allow contractors to rebuild the interchange's ramps, loops and slip roads. The agency described the works as scheduled reconstruction and said the disruption would be temporary.

Motorists urged to cooperate

The authority has asked drivers to follow temporary road signs, observe the traffic management plan and work with police officers and traffic marshals deployed at the site.

With the access points shut, motorists moving between Nairobi, Ndumbuini and Uthiru will have to use other roads for the duration of the works.

Alternative routes

KeNHA has published a traffic management plan setting out diversions intended to keep vehicles moving and limit inconvenience around the construction zone. The options include:

  • Nairobi to Ndumbuini: Exit at Kabete Technical on Waiyaki Way, head towards the Naivasha Road roundabout, use the Uthiru Underpass to turn back onto the Nairobi-bound carriageway, then take Marigioni Cabro Road to Ndumbuini Shopping Centre.
  • Second Nairobi option: Exit at Leadway Petrol Station, go through the Uthiru Underpass, rejoin the Nairobi-bound lanes and turn onto Marigioni Cabro Road.
  • Third Nairobi option: Exit at the 87/Muhuri Interchange, just past Shell Kinoo, and use the 87-Ndumbuini Road near 87 Mall.
  • From Rironi and Nakuru: Turn at Muhuri Interchange and use the Muhuri-Ndumbuini Road.
  • Ndumbuini to Nairobi: Use Marigioni Cabro Road, or Ndumbuini Road via the 87/Muhuri Interchange, to reach Waiyaki Way.
  • Ndumbuini to Rironi: Use the Nakuru-bound carriageway.
  • From Uthiru and Kawangware: Use the Uthiru Underpass or Muhuri Interchange.

A corridor with a troubled safety record

The stretch has been the scene of several accidents, Kenyans.co.ke reported. Speeding, speed bumps that are poorly marked, and heavy movement of pedestrians and matatus have fuelled concerns among road users.

Kamutiini, King'eero, Lower Kabete Road and Uthiru Bridge have been singled out as hazard spots. Residents in these areas have complained about inadequate footpaths, faded road markings and the risks pedestrians face.

The reconstruction is expected to make the Uthiru-Kapenguria-Ndumbuini corridor safer by keeping highway traffic apart from vehicles making local turns.

Dedicated exit and acceleration lanes are meant to give vehicles entering or leaving Waiyaki Way room to adjust their speed. This is expected to cut down on abrupt braking, risky merging and rear-end crashes.

Loop ramps, meanwhile, are designed to remove dangerous turns across oncoming traffic, while grade-separated routes should reduce conflict with local vehicles. However, the report notes that pedestrian crossings and suitable speed limits will still be essential to improving safety along the route.

Waiyaki Way is one of the main routes linking Nairobi to the western parts of the country, and the interchange serves commuters from the city's western suburbs and neighbouring areas of Kiambu County.

This story was prepared by the Hamasta Newsdesk with AI assistance, based on reporting by Kenyans.co.ke. Read the original report. Photo: Kenyans.co.ke.